Clients
A
AmBank Data Centre
Data Centres · 2024
2R Control Automation carried out an energy audit (2024) for AmBank Data Centre.
Energy Audit
Arcoris Mont Kiara
Office Buildings · 2025
2R Control Automation carried out an energy audit (2025) for Arcoris Mont Kiara.
Energy Audit
Auto Global Parts Industries Sdn Bhd
Automotive & Aerospace · 2026
2R Control Automation carried out an energy audit (2026) for Auto Global Parts Industries Sdn Bhd.
Energy Audit
B
B. Braun Malaysia
Healthcare & Medical · 2017
2R Control Automation carried out an energy-saving project (2017) for B. Braun Malaysia.
Energy Saving
Bakers Maison (M) Sdn Bhd
Food & Beverage · 2025
2R Control Automation carried out an energy audit (2025) for Bakers Maison (M) Sdn Bhd.
Energy Audit
Bericap Malaysia Sdn Bhd
Manufacturing · 2025
2R Control Automation carried out an energy audit (2025) for Bericap Malaysia Sdn Bhd.
Energy Audit
BJC Food Sdn Bhd
Food & Beverage · 2023
2R Control Automation carried out an energy audit (2023) for BJC Food Sdn Bhd.
Energy Audit
Boston Scientific Medical Device (M) Sdn Bhd
Healthcare & Medical · 2026
2R Control Automation carried out an energy audit (2026) for Boston Scientific Medical Device (M) Sdn Bhd.
Energy Audit
Bromma (M) Sdn Bhd
Manufacturing · 2024
2R Control Automation carried out an energy audit (2024) for Bromma (M) Sdn Bhd.
Energy Audit
D
DCH Manufacturing Sdn Bhd
Manufacturing · 2024
2R Control Automation carried out an energy audit (2024) for DCH Manufacturing Sdn Bhd.
Energy Audit
E
Evo Mall Bangi
Shopping Malls · 2021
2R Control Automation carried out an energy audit (2021) for Evo Mall Bangi.
Energy Audit
F
Faber Tower
Office Buildings · 2023
2R Control Automation carried out an energy audit (2023) for Faber Tower.
Energy Audit
Fraser Place Puteri Harbour
Hotels · 2025
2R Control Automation carried out an energy audit (2025) for Fraser Place Puteri Harbour.
Energy Audit
G
Gardenia Bakeries (KL) Sdn Bhd
Food & Beverage · 2025
2R Control Automation carried out an energy audit (2025) for Gardenia Bakeries (KL) Sdn Bhd.
Energy Audit
Gravit8 @ Klang South
Residential & Strata · 2022
2R Control Automation carried out an energy audit (2022) for Gravit8 @ Klang South.
Energy Audit
H
Hartalega Bestari Berjaya
Manufacturing · 2022
2R Control Automation carried out an energy audit (2022) for Hartalega Bestari Berjaya.
Energy Audit
Hexachase Flexipack Sdn Bhd
Manufacturing · 2025
2R Control Automation carried out an energy audit (2025) for Hexachase Flexipack Sdn Bhd.
Energy Audit
HICOM Teck See
Automotive & Aerospace · 2025
Energy Management
I
IPEX Global Manufacturing (M) Sdn Bhd
Manufacturing · 2025
2R Control Automation carried out an energy audit (2025) for IPEX Global Manufacturing (M) Sdn Bhd.
Energy Audit
J
Jaya Shopping Mall
Shopping Malls · 2024
Energy Management
Jen Hotel Penang
Hotels · 2025
2R Control Automation carried out an energy audit (2025) for Jen Hotel Penang.
Energy Audit
K
Kementerian Kerja Raya
Government · 2018
2R Control Automation carried out an energy-saving project (2018) for Kementerian Kerja Raya.
Energy Saving
Kementerian Pendidikan Malaysia
Government · 2019
2R Control Automation carried out an energy-saving project (2019) for Kementerian Pendidikan Malaysia.
Energy Saving
M
Master Tec Wire & Cable Sdn Bhd
Metals & Heavy Industry · 2024
2R Control Automation carried out an energy audit (2024) for Master Tec Wire & Cable Sdn Bhd.
Energy Audit
Menara Dana 13
Office Buildings · 2024
2R Control Automation carried out an energy audit (2024) for Menara Dana 13.
Energy Audit
Menara UOA Bangsar
Office Buildings · 2025
2R Control Automation carried out an energy audit (2025) for Menara UOA Bangsar.
Energy Audit
Multimedia University (MMU) Cyberjaya & Melaka
Education · 2022
2R Control Automation carried out an energy audit (2022) for Multimedia University (MMU) Cyberjaya & Melaka.
Energy Audit
O
Oji Asia Household Product Sdn Bhd
Manufacturing · 2024
2R Control Automation carried out an energy audit (2024) for Oji Asia Household Product Sdn Bhd.
Energy Audit
P
Palm Garden
Residential & Strata · 2023
2R Control Automation carried out a forensic utility billing investigation (2023) for Palm Garden.
PHN Industry Sdn Bhd (SA2)
Manufacturing · 2024
2R Control Automation carried out an energy audit (2024) for PHN Industry Sdn Bhd (SA2).
Energy Audit
Press Metal Aluminium Rods Sdn Bhd
Metals & Heavy Industry · 2024
2R Control Automation carried out an energy audit (2024) for Press Metal Aluminium Rods Sdn Bhd.
Energy Audit
S
S.E.H. (Shah Alam) Sdn Bhd
Manufacturing · 2026
2R Control Automation carried out an energy audit (2026) for S.E.H. (Shah Alam) Sdn Bhd.
Energy Audit
Safran Landing Systems Malaysia
Automotive & Aerospace · 2019
2R Control Automation carried out an energy-saving project (2019) for Safran Landing Systems Malaysia.
Energy Saving
Shangri-La Kuala Lumpur
Hotels · 2026
2R Control Automation carried out an energy audit (2026) for Shangri-La Kuala Lumpur.
Energy Audit
Spritzer Chuan Sin Sdn Bhd
Food & Beverage · 2024, 2023
2R Control Automation carried out an energy audit (2023) for Spritzer Chuan Sin Sdn Bhd and is providing GBI green building consultation (2024).
GBI · Energy Audit
Summer Suites
Hotels · 2026
2R Control Automation carried out an energy audit (2026) for Summer Suites.
Energy Audit
Syopz Mall
Shopping Malls · 2025, 2024
2R Control Automation carried out an energy audit (2024) for Syopz Mall and is providing GreenRE green building consultation (2025).
GreenRE · Energy Audit
T
TAR UMT
Education · 2026
2R Control Automation carried out 3 energy audits (2026) for TAR UMT.
Energy Audit
U
Unitata Berhad
Food & Beverage · 2025
2R Control Automation carried out an energy audit (2025) for Unitata Berhad.
Energy Audit
UTAR Sungai Long Campus
Education · 2024, 2020
2R Control Automation carried out an energy-saving project (2020) and an energy audit (2024) for UTAR Sungai Long Campus.
Energy Audit · Energy Saving
V
Vina Residency
Residential & Strata · 2022
2R Control Automation carried out a forensic utility billing investigation (2022) for Vina Residency.
W
Westport Terminal Grain
Logistics & Ports · 2025
2R Control Automation carried out an energy audit (2025) for Westport Terminal Grain.
Energy Audit
Get this for your facility
Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.