Skip to content

Energy saving · Healthcare & Medical

Energy Saving Project for B. Braun Malaysia (2017)

Energy-saving project for B. Braun Malaysia (2017): 65% saving in lighting.

Published results

65%

Lighting energy savingSource: B. Braun Malaysia · 2017

The site

Factory: isometric illustrationAn isometric drawing of a typical Factory building on its lot, with trees.

Illustration

Systems in this type of building

Production line and compressed airA compressor, receiver tank and air line feeding production machines, a conveyor with its motor and VSD, and an air leak.
  1. Air compressor · compressed air takes a lot of electricity to make
  2. Receiver tank · stores compressed air and evens out demand
  3. Air leak · leaks waste compressor power around the clock; 2R's tool: Ultrasonic leak imager
  4. Production machines · use compressed air and power at each station
  5. Conveyor line · moves product between stations, sometimes while empty
  6. Motor + VSD · speed matched to the line; motor speed checked with a Lutron DT-1236L tachometer

Illustration of typical systems, not a client's plant.

Equipment 2R uses here

  • Fluke 430 Series II · Main switchboard
  • Ultrasonic leak imager · Compressed-air lines
  • UNI-T UTi320E · Motors

Typical instruments for this type of site, from 2R's own equipment.

Get this for your facility

Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.