Energy Audit for Faber Tower (2023)

2R Control Automation carried out an energy audit for Faber Tower in 2023.

Published results

47.66%

Potential energy savingSource: Faber Tower · 2023

The site

Office tower: isometric illustrationAn isometric drawing of a typical Office tower building on its lot, with trees.

Illustration

Systems in this type of building

Air handlingAir from the air handling unit through the supply duct to the room and back, and where 2R checks airflow.
  1. Air handling unit (AHU) · blows air across the chilled-water coil and into the building
  2. Fan motor + VSD · varies the fan speed with demand instead of running flat out
  3. Cooling coil · chilled water in, cooled and dried air out
  4. Supply duct · carries conditioned air to the rooms
  5. Ceiling diffusers · spread the supply air across the room
  6. Return air · room air goes back to the AHU to be cooled again
  7. Room sensor · temperature or CO₂ reading that tells the AHU how hard to work
  8. Anemometer · air speed at the diffusers, to check the airflow: UNI-T UT363

Illustration of typical systems, not a client's plant.

Equipment 2R uses here

  • Kyoritsu 5202 · Lighting levels
  • UNI-T UT363 · AHU airflow

Typical instruments for this type of site, from 2R's own equipment.