Energy Saving Project for Kementerian Pendidikan Malaysia (2019)

Energy-saving project for Kementerian Pendidikan Malaysia (2019): 28% saving in lighting.

Published results

28%

Lighting energy savingSource: Kementerian Pendidikan Malaysia · 2019

The site

Civic complex: isometric illustrationAn isometric drawing of a typical Civic complex building on its lot, with trees.

Illustration

Systems in this type of building

Air handlingAir from the air handling unit through the supply duct to the room and back, and where 2R checks airflow.
  1. Air handling unit (AHU) · blows air across the chilled-water coil and into the building
  2. Fan motor + VSD · varies the fan speed with demand instead of running flat out
  3. Cooling coil · chilled water in, cooled and dried air out
  4. Supply duct · carries conditioned air to the rooms
  5. Ceiling diffusers · spread the supply air across the room
  6. Return air · room air goes back to the AHU to be cooled again
  7. Room sensor · temperature or CO₂ reading that tells the AHU how hard to work
  8. Anemometer · air speed at the diffusers, to check the airflow: UNI-T UT363

Illustration of typical systems, not a client's plant.

Equipment 2R uses here

  • Meatrol Mi550 · Main switchboard
  • UNI-T UT331 · Temperature & humidity

Typical instruments for this type of site, from 2R's own equipment.