Other · Residential & Strata
Electricity Usage Investigation & Energy Audit for Impiria Residensi Klang
2R Control Automation carried out an electricity usage investigation and energy audit for Impiria Residensi Klang.
Published results
RM269,679.50
The site
Illustration
Project story
The challenge
2R Control Automation Sdn. Bhd. was appointed by Impiria Residensi Klang to investigate unusually high electricity bills and verify the accuracy of electricity meter readings across residential units and common areas.
What 2R did
Through detailed energy audits, meter inspections, and data logging, our engineering team identified abnormal electricity meter readings across 10 residential units, highlighting potential meter tampering, known as Kes Usikan Pepasangan Meter (KUPM), and electricity billing discrepancies. The technical findings supported further investigation and billing review by Tenaga Nasional Berhad (TNB).
Outcome
In August 2025, Impiria Residensi Klang successfully received a refund of RM269,679.50 from TNB following the investigation into electricity meter irregularities, helping the management recover overcharged electricity costs.
Systems in this type of building
- LED panels · efficient fittings, at the light level the task needs
- Occupancy sensor · switches lights off in empty areas
- Daylight · lights near the windows can dim when there's enough daylight
- Lighting board · where lighting circuits are measured and scheduled
- Lux meter · measures light levels at the desk: Kyoritsu 5202
Illustration of typical systems, not a client's plant.
Equipment 2R uses here
- Meatrol Mi550 · Pumps
- Kyoritsu 5202 · Lighting levels
Typical instruments for this type of site, from 2R's own equipment.
More in Residential & Strata
- Electricity Usage Investigation & Energy Audit for Palm Garden (2023)Other · 2023RM53,177.90 TNB Refund
- Electricity Usage Investigation & Energy Audit for Vina Residency (2022)Other · 2022RM749,249.77 TNB Refund
- Energy Audit for Gravit8 @ Klang South (2022)Energy audit · 202225% Potential energy saving
- Electricity Usage Investigation & Energy Audit for Concerto North KiaraOther22 KUPM Meters Confirmed and Rectified by TNB
- Electricity Usage Investigation & Energy Audit for Damai HillparkOtherRM104,022.45 TNB Refund
- Electricity Usage Investigation & Energy Audit for Green ResidenceOtherRM54,713.20 TNB Refund
Get this for your facility
Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.