Energy audit · Education
Energy Audit for TAR UMT Kuala Lumpur (2026)
2R Control Automation carried out an energy audit for TAR UMT Kuala Lumpur in 2026.
Published results
54.94%
The site
Illustration
Systems in this type of building
- Cooling tower · rejects the chiller's heat outdoors
- Chiller · makes the chilled water for air-conditioning, often the biggest single electrical load
- Condenser water pump · circulates water between the chiller and the cooling tower
- Chilled water pump · sends chilled water to the air handlers; a VSD lets it follow the load
- Air handling unit (AHU) · blows air across the chilled-water coil and into the building
- Ultrasonic flow meter · clamped on the chilled-water pipe to measure flow and cooling load (RT)
- Power logger · logs kW, kWh and power factor over days: Meatrol Mi550 / Fluke 430 Series II
Illustration of typical systems, not a client's plant.
Equipment 2R uses here
- Meatrol Mi550 · Main switchboard
- Kyoritsu 5202 · Lighting levels
Typical instruments for this type of site, from 2R's own equipment.
More in Education
- Energy Audit for UTAR Sungai Long Campus (2024)Energy audit · 202464.07% Potential energy saving (KA Block)33.5% Potential energy saving (KB Block)
- Energy Audit for Multimedia University (MMU) Cyberjaya & Melaka (2022)Energy audit · 202216.9% Potential energy saving (Cyberjaya)27.63% Potential energy saving (Melaka)
- Energy Saving Project for UTAR Sungai Long Campus (2020)Energy saving · 202034% ACMV energy saving (Level 7)54% ACMV energy saving (Levels 3, 4, 6)
Get this for your facility
Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.