Energy audit · Manufacturing
Energy Audit for DCH Manufacturing Sdn Bhd (2024)
2R Control Automation carried out an energy audit for DCH Manufacturing Sdn Bhd in 2024.
Published results
6.25%
The site
Illustration
Systems in this type of building
- Air compressor · compressed air takes a lot of electricity to make
- Receiver tank · stores compressed air and evens out demand
- Air leak · leaks waste compressor power around the clock; 2R's tool: Ultrasonic leak imager
- Production machines · use compressed air and power at each station
- Conveyor line · moves product between stations, sometimes while empty
- Motor + VSD · speed matched to the line; motor speed checked with a Lutron DT-1236L tachometer
Illustration of typical systems, not a client's plant.
Equipment 2R uses here
- Fluke 430 Series II · Main switchboard
- Ultrasonic leak imager · Compressed-air lines
- UNI-T UTi320E · Motors
Typical instruments for this type of site, from 2R's own equipment.
More in Manufacturing
- Energy Audit for S.E.H. (Shah Alam) Sdn Bhd (2026)Energy audit · 20269.93% Potential energy saving
- Energy Audit for Bericap Malaysia Sdn Bhd (2025)Energy audit · 202526.42% Potential energy saving
- Energy Audit for Hexachase Flexipack Sdn Bhd (2025)Energy audit · 202521.66% Potential energy saving
- Energy Audit for IPEX Global Manufacturing (M) Sdn Bhd (2025)Energy audit · 202520.1% Potential energy saving
- Energy Audit for Bromma (M) Sdn Bhd (2024)Energy audit · 202415.47% Potential energy saving
- Energy Audit for Oji Asia Household Product Sdn Bhd (2024)Energy audit · 202417.63% Potential energy saving
Get this for your facility
Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.