Skip to content

Energy audit · Hotels

Energy Audit for Fraser Place Puteri Harbour (2025)

2R Control Automation carried out an energy audit for Fraser Place Puteri Harbour in 2025.

Published results

32.26%

Potential energy savingSource: Fraser Place Puteri Harbour · 2025

The site

Hotel: isometric illustrationAn isometric drawing of a typical Hotel building on its lot, with trees.

Illustration

Systems in this type of building

Chilled-water plantHow a chiller plant cools a building: cooling tower, chiller, pumps and air handler, and where 2R measures power and flow.
  1. Cooling tower · rejects the chiller's heat outdoors
  2. Chiller · makes the chilled water for air-conditioning, often the biggest single electrical load
  3. Condenser water pump · circulates water between the chiller and the cooling tower
  4. Chilled water pump · sends chilled water to the air handlers; a VSD lets it follow the load
  5. Air handling unit (AHU) · blows air across the chilled-water coil and into the building
  6. Ultrasonic flow meter · clamped on the chilled-water pipe to measure flow and cooling load (RT)
  7. Power logger · logs kW, kWh and power factor over days: Meatrol Mi550 / Fluke 430 Series II

Illustration of typical systems, not a client's plant.

Equipment 2R uses here

  • Ultrasonic flow meter · Hot-water loop
  • Kyoritsu 5202 · Lighting levels

Typical instruments for this type of site, from 2R's own equipment.

Get this for your facility

Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.