Energy audit · Education
Energy Audit for TAR UMT Penang (2026)
2R Control Automation carried out an energy audit for TAR UMT Penang in 2026.
The site
Illustration
Systems in this type of building
- Cooling tower · rejects the chiller's heat outdoors
- Chiller · makes the chilled water for air-conditioning, often the biggest single electrical load
- Condenser water pump · circulates water between the chiller and the cooling tower
- Chilled water pump · sends chilled water to the air handlers; a VSD lets it follow the load
- Air handling unit (AHU) · blows air across the chilled-water coil and into the building
- Ultrasonic flow meter · clamped on the chilled-water pipe to measure flow and cooling load (RT)
- Power logger · logs kW, kWh and power factor over days: Meatrol Mi550 / Fluke 430 Series II
Illustration of typical systems, not a client's plant.
Equipment 2R uses here
- Meatrol Mi550 · Main switchboard
- Kyoritsu 5202 · Lighting levels
Typical instruments for this type of site, from 2R's own equipment.
More in Education
- Energy Audit for UTAR Sungai Long Campus (2024)Energy audit · 202464.07% Potential energy saving (KA Block)33.5% Potential energy saving (KB Block)
- Energy Audit for Multimedia University (MMU) Cyberjaya & Melaka (2022)Energy audit · 202216.9% Potential energy saving (Cyberjaya)27.63% Potential energy saving (Melaka)
- Energy Saving Project for UTAR Sungai Long Campus (2020)Energy saving · 202034% ACMV energy saving (Level 7)54% ACMV energy saving (Levels 3, 4, 6)
Get this for your facility
Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.