Skip to content

4 projects

Hotels

Hotel energy audits for buildings that run around the clock: cooling, hot water, lighting and pumps.

Where energy usually goes

Hotel: isometric illustrationAn isometric drawing of a typical Hotel building on its lot, with trees.

Illustration

  • Chiller plant
  • Hot water
  • 24-hour lighting
  • Pumps

Systems 2R audits here

Chilled-water plantHow a chiller plant cools a building: cooling tower, chiller, pumps and air handler, and where 2R measures power and flow.
  1. Cooling tower · rejects the chiller's heat outdoors
  2. Chiller · makes the chilled water for air-conditioning, often the biggest single electrical load
  3. Condenser water pump · circulates water between the chiller and the cooling tower
  4. Chilled water pump · sends chilled water to the air handlers; a VSD lets it follow the load
  5. Air handling unit (AHU) · blows air across the chilled-water coil and into the building
  6. Ultrasonic flow meter · clamped on the chilled-water pipe to measure flow and cooling load (RT)
  7. Power logger · logs kW, kWh and power factor over days: Meatrol Mi550 / Fluke 430 Series II

Illustration of typical systems, not a client's plant.

Air handlingAir from the air handling unit through the supply duct to the room and back, and where 2R checks airflow.
  1. Air handling unit (AHU) · blows air across the chilled-water coil and into the building
  2. Fan motor + VSD · varies the fan speed with demand instead of running flat out
  3. Cooling coil · chilled water in, cooled and dried air out
  4. Supply duct · carries conditioned air to the rooms
  5. Ceiling diffusers · spread the supply air across the room
  6. Return air · room air goes back to the AHU to be cooled again
  7. Room sensor · temperature or CO₂ reading that tells the AHU how hard to work
  8. Anemometer · air speed at the diffusers, to check the airflow: UNI-T UT363

Illustration of typical systems, not a client's plant.

Relevant services

Get this for your facility

Tell us about your building or plant and we'll recommend the right next step: an audit, an energy-saving project or EECA compliance support.